Do I need Building Regulations Approval?

If you are planning to carry out 'Building Work' as defined in Regulation 3 of the Building Regulations, then it must comply with the Building Regulations. This normally means seeking approval of the work from a Building Control Body.

The following types of project amount to 'Building Work':

  • The erection or extension of a building
  • An alteration project involving work which will temporarily or permanently affect the ongoing compliance of the building, service or fitting with the requirements relating to structure, fire, or access to and use of buildings
  • When installing replacement windows using a builder or window company not  registered with the relevant Competent Person Schemes.
  • The installation or extension of a service or fitting which is controlled under the regulations
  • The insertion of insulation into a cavity wall
  • The underpinning of the foundations of a building
  • When you want to change the building's fundamental use

 

If your building work consists only of the installation of certain types of services or fittings (e.g. electrical installations in dwellings, heating, hot water, air-conditioning and ventilation, replacement windows, WCs, and showers) and you employ an installer registered with a relevant Competent Person Schemes as designated in the Building Regulations, that installer will be able to self-certify the work. Therefore, you will not need to involve a Building Control Service. However, this concession is strictly limited to the specific type of installations and does not cover any other type of building work.

The works themselves must meet the current relevant technical requirements in the Building Regulations and they must not make other fabric, services and fittings less compliant than they were before - or dangerous. For example, the provision of replacement double-glazing must not make compliance worse in relation to means of escape, air supply for combustion appliances and their flues and ventilation for health.

They may also apply to certain changes of use of an existing building. This is because the change of use may result in the building as a whole no longer complying with the requirements which will apply to its new type of use, and so having to be up-graded to meet additional requirements specified in the regulations for which building work may also be required.

Further information on specific types of work is available in the common projects area.

Building Regulations - Do I need approval?