Skip to content

Choose country and language preference

Planning Permission

Under new regulations that came into effect from 1 October 2008, fitting, altering or replacing an external flue, chimney, or soil and vent pipe is normally considered to be permitted development, not requiring planning consent, if the conditions outlined below are met:

  • Flues are allowed if less than one metre above the highest part of the roof.
  • If the building is listed or in a designated area even if you enjoy permitted development rights it is advisable to check with your local planning authority before a flue is fitted.
  • In a designated area the flue should not be fitted on the principal or side elevation that fronts a highway.

Please note: the permitted development allowances described here apply to houses not flats, maisonettes or other buildings. View guidance on flats and maisonettes here.


Building Regulations

If you wish to install a flue, building regulations apply. You should take into account factors such as ventilation and general safety. Installation should be carried out by a suitably qualified installer

Disclaimer: this is an introductory guide and is not a definitive source of legal information. Read the full disclaimer here.

NOTE: This guidance relates to the planning regime for England. Policy in Wales may differ. If in doubt contact your Local Planning Authority.

Claim free tickets for the Homebuilding and Renovating Show